I had a retrofit bid on a church about ready to email when my boss came in and started reading it.
We are a light commercial and residential comp. This was a 30 ton packaged chiller system with a new fan coil.
Tear out a old package chiller that had been fubarred over 50 years and install new chiller and fan coil
He does not know heavy commercial or chillers and this job scared him. I told him thats why he hired me. Long story short I had to no bid it. 25k commission and 3 days work down the drain. Oh well I have a job
We are a light commercial and residential comp. This was a 30 ton packaged chiller system with a new fan coil.
Tear out a old package chiller that had been fubarred over 50 years and install new chiller and fan coil
He does not know heavy commercial or chillers and this job scared him. I told him thats why he hired me. Long story short I had to no bid it. 25k commission and 3 days work down the drain. Oh well I have a job