And all I have done is the railroad tie foundation is leveled.
So far its taken 4 trips with my father in laws little 1/2 ton trailer.
Of those trips I was SERIOUSLY overloaded for that poor trailer. Had just over a ton once and had 1 1/4 ton the second time.
Looks like Ill need at least another 2 tons to fill the center plus however much pea rock Ill need to cover the gravel mounds on the outside so the chickens dont take it all out.
only two things Im complaining about is the friggen humidity and damned skeeters. Doesnt help any that I ran out of OFF.
Oh well if you guys want some pics I can get some for ya.
Buck adoodle doo!!
Forgot to mention this is for the new chicken coop.
So far its taken 4 trips with my father in laws little 1/2 ton trailer.
Of those trips I was SERIOUSLY overloaded for that poor trailer. Had just over a ton once and had 1 1/4 ton the second time.
Looks like Ill need at least another 2 tons to fill the center plus however much pea rock Ill need to cover the gravel mounds on the outside so the chickens dont take it all out.
only two things Im complaining about is the friggen humidity and damned skeeters. Doesnt help any that I ran out of OFF.
Oh well if you guys want some pics I can get some for ya.
Buck adoodle doo!!
Forgot to mention this is for the new chicken coop.